Stage One of the groundworks involved everything to do with the inside and immediate surroundings of the barn. The next stage of the groundworks will be to install our rainwater harvesting tank and a water treatment tank further down the garden. Stage three involves running a treated water discharge pipe the full length of our field down to the stream at the bottom.
|
Ready to start building works |
|
The view from the earth mound |
|
A very tidy site |
|
No Mud but the pipes freeze when it gets cold. |
So at this stage it looks like Kev, Dan and Paul from Vanstone's (Tel:
01288 321322) have done a great job and they've left the place nice and tidy. I just wish I'd spoken to them about burying the water supply to the caravan so it doesn't freeze in this arctic weather.
Stuart Bryant (Tel: 01288 321546) starts the main build just after Christmas if not before. We're really looking forward to the main build and seeing things come together rather than being taken apart. To be fair I think we'll always be looking forward to the 'next' stage of the build right up to moving in.
No comments:
Post a Comment