Groundworks are scheduled to begin on 11th October. This largely includes: -
- Laying a temporary drive to the site
- Filling in the milking pit
- Removing timbers making up the first floor
- Demolishing stone wall to one side of barn
- Laying drainage pipes
- Pouring concrete floors
- Install a sewerage treatment plant
- Install a rain collection tank
- Lay discharge pipes, 250m to stream