Monday, 18 April 2011

The latest from the inside

There are random bits of plastering going on all throughout the house. 1st fix plumbing must be nearly finished as there seems to be pipes everywhere! Reclaimed flooring has arrived and is ready to be fitted, sanded and oiled. The kitchen, worktops, cooker, extractor and thermal store are all due to be delivered shortly, thankfully we have space off site to store some of the more delicate items.
Stuff stuck to the windows to stop birds flying into them

Office room ready for plastering

Kitchen and door to utility area

Main bedroom plastered

Bathroom plastered

Cupboards on the landing area, home to the thermal store (eventually)

Secret door/bookcase through to storage area (shhhh)

The gallery

Stud wall to the shower room