Friday, 5 February 2010
Draft Plans
Wednesday, 3 February 2010
Snow Stops Play
Oops our application for planning permission has been delayed slightly due to... of all things, a skiing trip!! I'm sure it's not particularly good form to delay the project with such frivolity, you might say it demonstrates a lack of focus and a larger budget than the one i've disclosed but it was a free trip and it would have been rude to turn the opportunity down. The good news is that Sally is now a skier and has mastered blue and green runs... it's red and black runs next time she assures me.
With that said the final draft of our building plans are due to be sent to us on Friday 5th February. As soon as we can sign them off we can apply for planning permission.
Key timeline from here: -
- Planning Application 6-8 weeks
- Building Regs Drwgs 4 weeks
- Building Regs Approval 2 weeks
If all goes to plan we could be building by late May / June.
![]() |
| Happy Days |
Key timeline from here: -
- Planning Application 6-8 weeks
- Building Regs Drwgs 4 weeks
- Building Regs Approval 2 weeks
If all goes to plan we could be building by late May / June.
Wednesday, 6 January 2010
Planning Application
Early in December we agreed our ideal layout for the property. Our architects are working to set these ideas out on paper so that we can apply for planning permission by mid January.
We have focused on being sympathetic to the original building and attempted to create a practical country property while being aware of how any changes may affect our neighbours. We think we have made improvements in each of these areas over the original approved plans. Lets hope the planners see things the same way!
We have focused on being sympathetic to the original building and attempted to create a practical country property while being aware of how any changes may affect our neighbours. We think we have made improvements in each of these areas over the original approved plans. Lets hope the planners see things the same way!
Moving in date
We are planning to move into our caravan in Bude on 20th February. This will give us a chance to settle into the area, see what the worst of the winter has in store for us and wait to hear news of our planning application. Exciting but cold times ahead. Our living costs will be reduced but plenty of energy will be spent trying to keep warm.
Saturday, 24 October 2009
Services
Electricity is installed, we have a temporary distribution board in the garage with two double sockets and a supply running through an old foul water drain down to the caravan. The caravan is connected and tested.
Water is also installed on site, the meter is fitted, pipes are live, caravan is connected so we just need to flush through the pipes and finish some plumbing for waste water drainage at the caravan.
Telecoms are close to being installed. BT have run a cable through our neighbours ducting so we have to extract the cable and run it to the barn for connection.
Water is also installed on site, the meter is fitted, pipes are live, caravan is connected so we just need to flush through the pipes and finish some plumbing for waste water drainage at the caravan.
Telecoms are close to being installed. BT have run a cable through our neighbours ducting so we have to extract the cable and run it to the barn for connection.
![]() |
| Pecker to break concrete |
![]() |
| Electricity Cables |
| Digger, digging |
![]() |
| Temporary services in an old soil pipe |
| Our brand new 'leccy' meter |
Caravan
After getting the caravan on site we've been working on making it a comfotable place to live. Modifications include ripping out a sideboard and replacing it with a wood burner (made on the Blackdown Hills by the Windy Smithy). We've also ripped out the dividing wall to the second room so that we have a larger kitchen area and easy access to storage.
| Removing the electric fire and surround |
![]() |
| Henry the stove from WindySmithy |
| Awesome Views!! |
Monday, 7 September 2009
We are now proud owners of a barn and a field. Yay!
Applications have gone to South West Water and Western Power Distribution to install water and electricity.
Applications have gone to South West Water and Western Power Distribution to install water and electricity.
Architects Atelier 3 have been instructed, measured up and we're due to meet them at their offices on September 25th, 2009. This is obviously the exciting bit! Need to get a mood board sorted so they can see what kind of thing we like.
Budget planning and digging holes next to allow us to install electricity and water.
![]() |
| An old cesspit, convenient for the caravan |
![]() |
| Sally cutting back the undergrowth |
![]() |
| Park Farm |